Planning a Remodel in South Florida, Start to Finish: The Order That Saves Time and Money

By Scott Rosenberg, licensed GCLast updated 7 min read

The short answer

A South Florida remodel goes smoothest in this order: decide what you want and what you can live without, check the rules that apply to your property (flood zone, HOA or condo association, historic district, coastal line), set a budget with room for what's behind the walls, get drawings if walls, structure or layout change, hire a licensed contractor and sign a written contract with Florida's required notices, apply for permits and submit to your association at the same time, record a Notice of Commencement on jobs over $5,000, build with inspections and written change orders, and close out with final inspections, lien releases and a closed permit before the last payment. Most delays and surprise costs come from doing these steps out of order.

Most remodels that go wrong don't go wrong during construction. They go wrong months earlier, when someone signs a contract before checking the flood zone, orders cabinets before the HOA approves the plans, or pays half up front to a contractor whose license they never looked up. The building part is usually the easy part.

This is the order we walk our own clients through. Each step links to the guide or post that covers it in detail, so treat this page as the map.

1. Decide what you want, and what you can live without

Write down the problems you're solving before you think about finishes. "The kitchen is too small to cook in with two people" leads to a better design than "we want white cabinets." Then sort the list into must-haves and nice-to-haves. When the budget gets tight, and it usually does, you'll already know what to cut.

If the house is older, add one more item: find out what's behind the walls. Homes from the 1950s through the 1970s often hide cast iron drains, old wiring, and lead paint or asbestos in materials you're about to disturb. Our post on renovating an older home covers what to check, and our post on concrete block versus wood frame houses explains why a block house changes what's easy to move.

2. Check the rules that come with your property

Before anyone draws anything, find out which of these apply. Each one can change the scope, the budget or the schedule:

Property checks to make before design starts
CheckWhy it mattersWhere to read more
Flood zoneIn a special flood hazard area, a large remodel can trigger the 50 percent rule and require bringing the house up to flood standardsThe 50 percent rule
HOA or condo associationMost exterior work, and almost any condo work, needs association approval with its own rules and timelineHOA approval and permits, Remodeling a condo unit
Historic district or design reviewSome cities review exterior changes before a permit can be issuedCoral Gables, Miami Beach
Hurricane code zoneMiami-Dade and Broward are in the High-Velocity Hurricane Zone, so windows, doors and roofs need products approved for itImpact windows and approvals
Near the beachWork seaward of the Coastal Construction Control Line can need a state permitCCCL permits
Open or expired permitsOld open permits or unpermitted work can hold up new permitsFixing unpermitted work

Every city also has its own quirks. Our permits by city guide links to a local guide for each one we've covered.

3. Set a budget you can actually stick to

We don't publish prices for jobs we haven't seen, but you can get a sense of the range from published data. Our kitchen remodel guide shows the 2025 Cost vs. Value figures for Miami, and our guide to what it costs to build a house breaks down where the money goes on a bigger project.

  • Hold back a contingency. Something always turns up once walls and floors are open. Decide before you start how much of the budget is set aside for it, and don't spend it on upgrades.
  • Count the soft costs. Drawings, engineering, surveys, permit fees and association fees aren't construction, but they're part of the price.
  • Know the money that comes back. If you're hardening the house, a My Safe Florida Home grant and the new sales tax refund can cover part of it, and wind mitigation credits can lower your insurance.
  • Think about taxes. A big addition can raise your assessed value. Our post on Amendment 3 and renovations explains how improvements are treated.

4. Get the design and drawings done

Cosmetic work doesn't need drawings, but moving walls, changing structure, adding square footage or reworking plumbing usually does. In a concrete block house, an interior wall you want gone may be holding up the roof, which means an engineer. Our guide to permit drawings explains when you need an architect, when an engineer is enough, and what goes into a permit set.

This is also the time to make your selections: cabinets, counters, windows, tile, fixtures. Decisions made now cost nothing. The same decisions made after construction starts cost time, and sometimes a change order.

5. Hire a licensed contractor

Look up the license on the state's website, confirm the insurance, and compare bids that cover the same scope. A low bid that leaves out permits, drawings or cleanup isn't really lower. Our guide to hiring a general contractor has the full checklist, including the warning signs that show up after a storm.

6. Sign a real contract

In Florida, a residential contract over $2,500 has to include the construction lien law notice and the Homeowners' Construction Recovery Fund notice. If the contractor takes more than 10 percent up front, state law expects them to apply for permits within 30 days and start work within 90 days after the permits are issued, unless you agree otherwise in writing. Beyond what's required, a good contract spells out the scope, the allowances, the payment schedule tied to finished work, and how changes are priced. Our remodeling contract checklist goes line by line.

7. Permits and association approval, at the same time

  • Find out what needs a permit. Most remodels that touch plumbing, electrical, structure, windows or the roof do. Our guide to whether you need a permit goes room by room, including the 2026 exemption for small single-family jobs.
  • Submit to the association in parallel. Since 2026, an HOA can't require you to get the building permit before it reviews your plans, so there's no reason to wait for one before starting the other.
  • Plan for the review time. Our post on how long permits take covers the state deadlines and what slows a review down.
  • Watch the code date. Permit applications submitted on or after December 31, 2026 fall under the Florida Building Code 9th Edition.
  • Record the Notice of Commencement. For jobs over $5,000 (over $15,000 for A/C repair or replacement), it has to be recorded and posted on the job before the first inspection.

8. Build: inspections, change orders and living through it

Once permits are issued, the work moves through inspections in order, and walls don't close until the rough inspections pass. Expect surprises in older houses and handle each one the same way: a written change order with the price and the time it adds, signed before the work is done. If you're living in the house, set up a temporary kitchen or bathroom, agree on work hours and the crew's path through the house, and pick one person to answer questions quickly. Our post on the best time of year to remodel explains why the dry season makes this easier.

9. Close it out properly

The end of a job is where homeowners get hurt by things they never saw. Before the final payment, make sure:

  1. Every final inspection has passed and the permits are closed, not just "finished." An open permit can come back when you sell, as our post on buying or selling with unpermitted work explains.
  2. You have lien releases from the contractor and from every subcontractor or supplier who sent you a Notice to Owner, plus the contractor's final payment affidavit. Our guide to construction liens explains why paying the contractor doesn't always mean everyone got paid.
  3. You have the warranties, product approvals and manuals, and a walk-through punch list that's been completed.

The bottom line

Most remodel trouble comes from doing the right things in the wrong order. Check the property's rules before design, finish the design before hiring, sign a proper contract before paying, run permits and association approval side by side, and don't make the last payment until the permits are closed and the lien releases are in hand. We plan and build kitchen and bath remodels, whole-home renovations and additions across Miami-Dade, Broward and Palm Beach, and you can read how we work before you call. Tell us about your project.

Quick questions

What is the first step in planning a remodel in South Florida?
Decide what problems you're solving and what you can live without, then check the rules that come with your property: flood zone, HOA or condo association, historic district and hurricane code zone. Those checks can change the scope and the budget before any design starts.
Should I get HOA approval or the building permit first?
Do them at the same time. Under Florida's 2026 law, an HOA can't require you to get the building permit before it reviews your plans, so submitting to both in parallel saves weeks.
How much should I pay a contractor up front in Florida?
Florida doesn't cap deposits, but a contractor who takes more than 10 percent of the contract price up front has to apply for permits within 30 days and start work within 90 days after the permits are issued, unless you agree otherwise in writing. Tie the rest of the payments to finished work.
Do I need a Notice of Commencement for a remodel?
Yes, for jobs over $5,000, or over $15,000 for A/C repair or replacement. It has to be recorded and posted on the job site before the first inspection, and it protects you under Florida's lien law.
What should I get before making the final payment?
Passed final inspections and closed permits, lien releases from the contractor and from everyone who sent you a Notice to Owner, the contractor's final payment affidavit, and the warranties and product paperwork.

Sources

This article is general information, not legal advice. Building departments in Miami-Dade, Broward and Palm Beach counties set their own procedures, so confirm the requirements for your property with your local building department.

Scott Rosenberg

Florida Certified General Contractor, CGC1541479

Scott qualifies Rosemont Ventures Group LLC and has worked in general contracting since 1998. He writes Building Blocks to answer the questions South Florida owners ask before they build. Verify the license.