The Best Time of Year to Remodel in South Florida

By Scott Rosenberg, licensed GC5 min read

The short answer

In South Florida, the best months for exterior work, such as roofs, windows, additions, concrete and paint, are usually the dry season after hurricane season, from about November to April. The rainy season runs from about May 15 to October 15 and brings most of the year's rain, and hurricane season runs from June 1 to November 30, so work that leaves the house open is riskier in summer and early fall. Interior remodels can be done any time of year. The smartest plan is often to design and get permits in the summer, so construction is ready to start when the dry season arrives.

Most remodeling advice online is written for places with snow, where the best season is spring and summer. South Florida runs the other way. Our summer brings daily storms and hurricane season, and our winter is the dry, mild stretch when outdoor work goes smoothly. The calendar also changes inside condo buildings, where the seasonal residents arrive in the fall and leave in the spring.

Here is how the year breaks down for different kinds of projects.

The South Florida construction calendar

What each part of the year means for construction
SeasonMonthsWhat it means
Dry seasonAbout mid-October to mid-MayFewer storms and less rain. The easiest time for roofing, window and door replacement, concrete, stucco and exterior paint.
Rainy seasonAbout May 15 to October 15Most of the year's rain, often in afternoon storms. Exterior work slows, concrete and roofing need weather windows, and paint and stucco can be delayed.
Hurricane seasonJune 1 to November 30Projects that leave the house open, such as roof replacement, window removal or second-story additions, carry more risk. Sites need a plan to secure materials and protect openings if a storm approaches.
Snowbird seasonRoughly November to AprilCondo buildings are full. Many associations limit work hours, noise and elevator use more in season, and seasonal owners often want work done before they arrive or after they leave.
Sea turtle nesting seasonIn Fort Lauderdale, March 1 to October 31Beachfront work and lighting are restricted on the beach side. See our post on building near the beach.
Rainy season dates are from the National Weather Service office in Miami, which says 60 to 70 percent of the year's rain falls in that period.

Timing by type of project

  • Roof replacement. Best in the dry season. A roof is open to the weather until it is dried in, and in hurricane season a tarp is not much protection. If a storm damages the roof, our post on storm damage repairs covers what to do first.
  • Impact windows and doors. Installation itself is quick, but products are often made to order, so lead times matter more than the season. Order in the summer to install in the fall, and check the approvals with our guide on looking up an NOA.
  • Additions and second stories. Foundation and block work tolerate rain better than an open roof. For a second story, plan the roof-off stretch for the dry season.
  • Kitchens and bathrooms. Mostly interior, so any month works. The real constraints are lead times on cabinets and fixtures and, in condos, building rules.
  • Condo unit remodels. Many owners prefer summer, when buildings are quieter and seasonal owners are away, but check your association's rules on work hours and seasonal restrictions; our condo renovation guide explains what to ask.
  • Exterior paint, stucco and concrete driveways. Dry season, for fewer rain delays and better curing.
  • New homes. A new home spans more than one season either way. What matters is when the shell gets dried in, ideally before the peak of hurricane season.

Plan backwards from the start date

The construction start date is the end of a chain: design, any HOA, design board or historic approval, then the building permit. Florida law sets review deadlines for building departments once an application is complete, but corrections and other approvals add time; our post on permit timelines explains them. That is why the best time to start planning a dry-season project is usually late spring or summer. Design and permitting can happen while it rains, and construction can start when it stops.

Contractor availability

Because so many people want exterior work done in the dry season, contractors' schedules tend to fill up for those months. Getting a signed contract and permits in place before the season starts is the best way to hold a slot. After a storm, demand for repairs can spike suddenly, which is another reason to avoid starting non-urgent exterior work at the height of hurricane season.

The bottom line

In South Florida, build outside in the dry season, plan and permit in the summer, and keep interior work flexible. If you are thinking about a project for this winter, now is the time to start the design and permits. We handle home renovations, kitchens and bathrooms, additions and impact windows and doors across Miami-Dade, Broward and Palm Beach. Tell us what you are planning and we will help you pick the right start date.

Quick questions

What is the best time of year to remodel in South Florida?
For exterior work, usually the dry season from about November to April, after hurricane season ends. Interior remodels can be done any time. Many homeowners design and permit in the summer so construction can start when the dry season begins.
When is the rainy season in South Florida?
The National Weather Service office in Miami puts it from May 15 to October 15, when about 60 to 70 percent of the year's rain falls.
Should I replace my roof during hurricane season?
If you can choose, the dry season is better, because the house is open to the weather until the new roof is dried in. If storm damage forces the work, ask your contractor for a storm plan to protect the house if another storm is forecast.
Is summer a good time to remodel a condo?
Often, because many seasonal residents are away and buildings are quieter. Check your association's rules first, since work hours, noise limits and elevator access vary by building and by season.
How far ahead should I plan a remodel in South Florida?
Work backward from the start date: design, any HOA, design board or historic approvals, then the building permit. For a dry-season start, it is usually best to begin planning in late spring or summer.

Sources

This article is general information, not legal advice. Building departments in Miami-Dade, Broward and Palm Beach counties set their own procedures, so confirm the requirements for your property with your local building department.

Scott Rosenberg

Florida Certified General Contractor, CGC1541479

Scott qualifies Rosemont Ventures Group LLC and has worked in general contracting since 1998. He writes Building Blocks to answer the questions South Florida owners ask before they build. Verify the license.

Free estimate

Tell us what you want to build

Send a few details and a licensed contractor will call you back, usually within one business day. We'll talk through scope, permits and a realistic budget range. No pressure and no obligation.

Request a callback