How we work

From the first call to the final inspection

Most people who call us have heard at least one contractor horror story, and a few have lived one. So here is exactly how a project runs with us, step by step, including the paperwork Florida law requires and the parts most contractors never explain.

The eight steps of a project

  1. 1

    First call and site visit

    Week 1

    We talk through what you want, then visit the property to measure, look at the structure, the roof, the electrical panel and the site, and check for anything that changes the plan, like a flood zone or an HOA. If the project doesn't make sense, or needs an engineer before anyone can price it, we tell you that up front. The visit is free.

    Your part: Share any plans, surveys, HOA rules or photos you have, and your rough budget. A budget isn't a target for us to hit; it tells us which options are worth drawing up.

  2. 2

    Written proposal

    Usually 1 to 2 weeks after the visit

    You get a written scope of work: what's included, what isn't, allowances for items you haven't picked yet, like tile or fixtures, a realistic schedule and a payment schedule tied to finished milestones, not to dates on a calendar.

    Your part: Read the exclusions as carefully as the price. That's where proposals that look cheaper usually differ.

  3. 3

    The contract

    When you're ready

    Our contracts include the notices Florida law requires on residential work over $2,500: the construction lien law notice and the Homeowners' Construction Recovery Fund notice, plus the Chapter 558 construction defect notice. If we take more than 10 percent of the price as a deposit, Florida Statute 489.126 requires us to apply for permits within 30 days and start within 90 days after the permits are issued. Our contract checklist explains each clause.

    Your part: Ask about anything you don't understand before you sign. If you sign at your home, Florida's home solicitation law gives you three business days to cancel.

  4. 4

    Design, engineering and HOA

    Depends on the project

    Additions, new homes and structural work need drawings signed and sealed by a Florida architect or engineer; we coordinate them or work from the plans you already have. Windows, doors and roofing are chosen with a current product approval for the High-Velocity Hurricane Zone. If you have an HOA, its review runs at the same time as the permit; since 2026, an association can't require a permit before it reviews your plans.

    Your part: Make your selections on time. Late decisions on finishes are the most common cause of delay we see.

  5. 5

    Permits and the Notice of Commencement

    From a few days to several weeks

    We apply for the permits in our name and answer every plan-review comment. Florida sets deadlines once an application is complete: 5 business days for work under $15,000 on an existing single-family home and 30 business days for a home under 7,500 square feet. For jobs over $5,000, a Notice of Commencement is recorded and posted before the first inspection; if you have a construction loan, your lender records it. Our permit timeline guide covers the details.

    Your part: Sign the Notice of Commencement in front of a notary and record it with the county, or let us handle the recording.

  6. 6

    Construction and inspections

    The bulk of the schedule

    Work moves in inspected phases: footings and slab, framing or block, roof, rough electrical, plumbing and mechanical, insulation, then finishes. We call every inspection, and nothing gets covered up until it has passed. You get regular updates with photos, and when a hurricane watch is issued, the site is secured the way the county requires.

    Your part: Keep a path clear for the crew and plan around noisy days. We'll tell you which ones they are.

  7. 7

    Changes and payments

    Throughout

    Any change, yours or a surprise behind a wall, gets a written change order with its price and its effect on the schedule, and you approve it before the work is done. Payments follow finished milestones. Before each payment, we provide lien releases from the subcontractors and suppliers who sent you a Notice to Owner, so you never pay twice for the same work.

    Your part: Never pay anyone on the job directly, and don't make the final payment until you have the contractor's final payment affidavit and the releases. Our lien law guide explains why.

  8. 8

    Final inspection and closeout

    The last week or two

    We pass the final inspections and close the permits, or get the certificate of occupancy or completion on new construction and additions. Then we walk the project with you and finish every item on the punch list. You get the permit records, product approvals and manufacturer warranties, which matter when you insure, refinance or sell.

    Your part: Walk the job with us and write down anything that isn't right. If you recorded a Notice of Commencement, you can record a notice of termination once the work is done and everyone is paid.

What you can count on

  • A written scope and price before any work starts
  • Permits pulled in our name, under license CGC1541479
  • Licensed electricians, plumbers, mechanical and roofing contractors on every specialty
  • Every change priced in writing and approved by you first
  • Lien releases with every payment
  • The same phone number from the first call to the final inspection: 786-464-4555

What we won't do

  • Ask for a deposit before there's a signed contract
  • Start without a permit, or suggest you pull an owner-builder permit for our work
  • Ask to be paid in cash to keep the job off the books
  • Waive an insurance deductible or offer anything to get a claim
  • Disappear after the deposit. Our office isn't going anywhere, and neither is our license number.

Questions about our process

How soon can you start my project?

It depends mostly on design and permits. Small jobs on an existing home can be permitted in a matter of days once the application is complete, while additions and new homes need drawings, engineering and longer reviews. We give you a realistic start date in the proposal and update it if anything changes.

Do you pull the permits in your name?

Yes. Every permit is pulled under our Florida Certified General Contractor license, CGC1541479, and we call every inspection through final. We won't ask you to pull an owner-builder permit for work we're doing.

How much is the deposit?

It depends on the project and on what has to be ordered up front, like impact windows or cabinets. Payments after that follow finished milestones. If a deposit is more than 10 percent of the price, Florida law requires us to apply for permits within 30 days and start within 90 days after the permits are issued.

What happens if I want to change something during the job?

We write up a change order with the price and the effect on the schedule, and the work happens only after you approve it. The same goes for surprises we find behind walls or under floors.

I already have plans from an architect. Can you build from them?

Yes. We review them for buildability, cost and code issues before we price the job, and we work with your architect or engineer during permitting and construction.

Who do I talk to during the project?

The people running your job, at the same number on this site, 786-464-4555. You get regular updates with photos, and you'll always know what's happening this week and what's next.

Related guides

Free estimate

Tell us what you want to build

Send a few details and a licensed contractor will call you back, usually within one business day. We'll talk through scope, permits and a realistic budget range. No pressure and no obligation.

Request a callback