The short answer
In Plantation, permits are applied for electronically through the city's Citizen Access portal by a contractor registered with the city, or by an owner-builder after meeting a plan reviewer. On single-family homes, re-roofs, windows and doors, shutters, water heaters and A/C replacements can be permitted the same day on Wednesday mornings when the package is complete; the city says larger projects take about one to ten working days. A Notice of Commencement is needed for jobs over $5,000, or over $15,000 for A/C replacements, before the first inspection. Inspections requested by noon are scheduled for the next business day. Work that touches the canals, or the rights-of-way and easements along them, also needs a permit from the Old Plantation Water Control District, and removing or relocating a tree on a single-family lot needs a city permit. Construction is allowed from 7 a.m. to 8 p.m., Monday through Saturday.
Plantation looks the way it does on purpose. The big oaks, the wide lots and the canals behind half the backyards are what people move here for, and they're also what shape almost every project. A lot of the houses went up between the 1950s and the 1980s, so the work we see most is additions and full renovations of homes with solid block walls and tired everything else.
This guide covers what is specific to building and remodeling in Plantation, based on the city's own building department information.
How permits work in Plantation
- Electronic submittal. Plans and documents go in through the city's Citizen Access portal with the permit application, and plan review comments are posted there too.
- Contractors register first. To pull permits in Plantation, a contractor has to be registered with the city, with a state or county license and current general liability and workers' compensation certificates naming the city.
- The contract goes with the application. Permit fees are based on the job's value, so the city asks for the contract showing the scope, the price and who hired whom.
- Owner-builders meet a reviewer first. An owner doing the work on their own single-family home has to show proof of ownership, sign an owner-builder affidavit and meet with a plan reviewer before applying.
- Permits don't last forever. A permit is valid for 180 days from issue, then for 90 days after each approved inspection, so a stalled job can lose its permit.
For everything else, the city says minor permits can be issued the same day and larger projects take about one to ten working days once they're in review. Florida law also sets deadlines once an application is complete; our post on how long building permits take explains them. New homes are reviewed by the county's development and environmental review section before they reach the building department, so add that step to the schedule.
The Plantation Building Department: contact, hours and registration
| Details | |
|---|---|
| Address | 401 NW 70th Terrace, 1st floor, Development Services Building, Plantation, FL 33317 |
| Main phone | 954-797-2765 |
| Inspection line | 954-678-2632 |
| helpmebuilding@plantation.org | |
| Office hours | 7 a.m. to 5:30 p.m.; sign in by 5:15 p.m. |
| Plan reviewers and inspectors | 7:30 a.m. to 4 p.m. |
Contractor registration for ePermits. Only licensed contractors can apply online. The steps: create a Citizen Access account, fill out the city's Online Web User Declaration Form (plus a Delegate Authorization Form if someone in your office will submit for you), have it signed and notarized, and drop it off, mail it or email it to the building department. The city says it emails your status within one to two business days. Owner-builders, developers and permit expediters who aren't licensed contractors should call or email the department, since the online path is for contractors. Forms are on the city's online permitting pages.
Inspections, changes and the Notice of Commencement
- Next-day inspections. Requests received by noon are scheduled for the next business day. A failed inspection carries a $100 re-inspection fee, paid before the next one.
- Plan changes ahead of time. Revised plans have to be submitted at least three days before the inspection they affect, approved by the architect or engineer of record. Small red-lined changes are only accepted before the rough inspection.
- Notice of Commencement. It isn't needed to apply, but jobs over $5,000, or over $15,000 for A/C replacements, need a recorded notice before the first inspection. Our lien law guide explains what it protects.
- Preliminary review. If you want plans reviewed before you've hired a contractor, the city offers a preliminary review through a cost recovery account that starts with a $1,000 deposit.
The Old Plantation Water Control District
Plantation's canals aren't run by the city. The Old Plantation Water Control District, created in 1946, maintains about 36 miles of canals and four major pumping stations inside the city. Its canals are lined with district-owned rights-of-way that have to stay clear for maintenance, so fences, docks, sheds, trees and play sets don't belong there.
If your project connects to a canal, places anything in or across it, or uses the district's land, you need a district permit or license agreement, reviewed by staff and approved by the district's board, in addition to the city permit. Some projects also need a South Florida Water Management District permit. On a canal lot, ask for the district's easement before the design is drawn, not after. Our Fort Lauderdale guide covers seawalls and waterfront work in more depth.
Trees and landscaping
The tree canopy is one of the things Plantation protects. Removing or relocating a tree on a single-family lot needs a permit from the city's environmental landscaping division, and tree trimming has its own permit checklist. Construction worth more than 10 percent of the lot's value, other than a re-roof, also triggers landscaping requirements. Under Florida Statute 163.045, a city can't require a permit to remove a tree on residential property that a certified arborist or Florida-licensed landscape architect documents as a danger to people or property.
For an addition, that means locating the big trees on the survey first and protecting their roots during construction. It's much cheaper to move a wall on paper than to argue about an oak later.
Job-site rules
- Hours. Construction is allowed Monday through Saturday from 7 a.m. to 8 p.m., and pile driving from 8 a.m. to 5:30 p.m. No work on Sundays or holidays.
- Debris haulers. Only city-franchised companies can haul construction and demolition debris, so check your contractor's dumpster company.
- Alarm systems. Contractors installing a burglar alarm in a single-family home need a registration permit from the Plantation Police Department first.
- Changing contractors. If you need to replace your contractor mid-job, the city wants a notarized release letter from the original permit holder, or a hold harmless form if that isn't possible.
Older homes and the building safety program
Plantation follows Broward County's building safety inspection program, which requires structural and electrical inspections for buildings at 25 years old and every ten years after; one- to four-family homes and other small buildings are exempt. See our post on the Broward 25-year building safety inspection. For the houses themselves, a remodel of a 1960s or 1970s home here often means a new electrical panel, new plumbing lines and impact windows. If it's in a flood zone, read our post on the 50 percent rule before you settle on the scope.
Sometimes the better answer is to start over. When an older house isn't worth saving, our demolition division handles demolition in Plantation under the same license, so the teardown and the new home can be one contract.
Working in more than one city? Our South Florida building permits guide compares how permits work in each city and county, with links to every local guide.
The bottom line
In Plantation, permits go through Citizen Access with a city-registered contractor, simple single-family jobs can be permitted the same day on Wednesdays, inspections are next-day, and the Notice of Commencement is due before the first inspection. On canal lots, bring in the water control district early, and plan around the trees. We handle room additions, whole-home renovations, kitchen and bathroom remodels, impact windows and doors and new homes in Plantation and across Broward. Tell us about your project.
Quick questions
- How do I apply for a building permit in Plantation, FL?
- Through the city's Citizen Access portal, which handles electronic plan submittal and review. The contractor has to be registered with the city first. Owner-builders working on their own single-family home must show proof of ownership, sign an affidavit and meet with a plan reviewer before applying.
- Where is the Plantation building department and what is its phone number?
- The City of Plantation Department of Building Safety is at 401 NW 70th Terrace, 1st floor, in the Development Services Building. The main number is 954-797-2765, the inspection line is 954-678-2632, and the office is open 7 a.m. to 5:30 p.m., with sign-in by 5:15 p.m.
- How does a contractor register with the City of Plantation?
- Create a Citizen Access account, complete the city's Online Web User Declaration Form (and a Delegate Authorization Form if needed), have it notarized, and submit it to the building department in person, by mail or by email. The city emails your status within one to two business days.
- Can I get a same-day permit in Plantation?
- For single-family homes, yes, on Wednesdays from 6 to 9 a.m., for A/C replacements, water heaters, re-roofs, shutters and windows and doors. The permit must stand alone, the package must be complete, and each contractor is limited to five submittals.
- When do I need a Notice of Commencement in Plantation?
- For jobs over $5,000, or over $15,000 for A/C replacements. It isn't needed to apply, but it has to be recorded before the first inspection.
- Do I need a permit to remove a tree in Plantation?
- Usually, yes. Removing or relocating a tree on a single-family lot needs a permit from the city's landscaping division. Under Florida Statute 163.045, no permit can be required when a certified arborist or Florida-licensed landscape architect documents that the tree is a danger to people or property.
- What is the Old Plantation Water Control District?
- An independent drainage district created in 1946 that maintains about 36 miles of canals and four pumping stations inside Plantation. Work that connects to, crosses or uses its canals or the rights-of-way along them needs a district permit in addition to the city permit.
- What are construction hours in Plantation?
- Monday through Saturday from 7 a.m. to 8 p.m., with pile driving limited to 8 a.m. to 5:30 p.m. Construction isn't allowed on Sundays or holidays.
Sources
- City of Plantation, Department of Building Safety (address, phone, hours)
- City of Plantation, ePermit (Citizen Access) registration
- City of Plantation, Building Department FAQ (plan processing, inspections, Notice of Commencement, hours)
- City of Plantation, Same-Day Permit Services
- City of Plantation, Permit Information & Submittal
- City of Plantation, Building Safety Inspection Program
- City of Plantation, Environmental Landscaping Division
- Old Plantation Water Control District, FAQ and Permits
This article is general information, not legal advice. Building departments in Miami-Dade, Broward and Palm Beach counties set their own procedures, so confirm the requirements for your property with your local building department.

Scott Rosenberg
Florida Certified General Contractor, CGC1541479
Scott qualifies Rosemont Ventures Group LLC and has worked in general contracting since 1998. He writes Building Blocks to answer the questions South Florida owners ask before they build. Verify the license.