Skip to main content
RosemontVentures Group

Licensed Florida GC · CGC1541479

General Contractor in Plantation, FL

Plantation is one of Broward's established cities: big shade trees, wide lots and a lot of houses built between the 1950s and the 1980s. Many of them have good bones and tired systems, which makes Plantation a city of additions, full renovations and the occasional teardown and rebuild.

What to know before you build or remodel in Plantation

  • Permits run through the City of Plantation's Citizen Access portal, and contractors have to be registered with the city before they can apply. Some simple single-family permits, like re-roofs, windows and doors, water heaters and A/C replacements, can be issued the same day.
  • The canals have their own district. Much of the city drains through the Old Plantation Water Control District, and work in its canal rights-of-way or easements needs a district permit on top of the city's.
  • Trees matter here. Tree removal and relocation on a single-family lot need a permit from the city's landscaping division, so plan additions around the big oaks before you draw them.
  • Construction hours are 7 a.m. to 8 p.m., Monday through Saturday, with no work on Sundays or holidays.
  • High-Velocity Hurricane Zone design and product approvals apply to every new roof, window and door.

What we do most in Plantation

Room additions and master suites, whole-home renovations of older ranch houses, kitchens and baths, impact windows and doors, and new homes where an old house comes down. Our Plantation building guide covers permits, same-day permits, the water control district and trees in detail.

FAQ

Plantation: common questions

Do I need a permit to replace windows or a roof in Plantation?

Yes. Windows, doors, shutters and re-roofs need permits, but on single-family homes the City of Plantation can often issue them the same day through its Citizen Access portal when the application is complete.

Does my Plantation home need anything from the Old Plantation Water Control District?

If the work connects to, crosses or uses the district's canals or the rights-of-way and easements along them, yes: you need a district permit in addition to the city permit. We check your lot for canal easements before design.

Free estimate

Tell us what you want to build

Send a few details and a licensed contractor will call you back, usually within one business day. We'll talk through scope, permits and a realistic budget range. No pressure and no obligation.

Request a callback