Bathroom Remodeling in South Florida: Permits, Inspections, Code Requirements and Real Cost Data

By Scott Rosenberg, licensed GC9 min read

The short answer

In South Florida, most bathroom remodels need permits: a building permit when walls, tile backer board or framing are replaced, a plumbing permit for a new shower, a replaced shower pan or moved fixtures, an electrical permit for new circuits, and a mechanical permit for a new exhaust fan in many cities. The plumbing inspector checks the shower pan before tile goes on, including approved liner material, a minimum shower size of 900 square inches and anti-scald valves. According to the 2025 Cost vs. Value report for Miami, a midrange bathroom remodel averaged $25,565 and recouped 75.1 percent at resale, a universal design bathroom averaged $40,234, and an upscale remodel averaged $79,971. In older South Florida homes, the price is driven less by tile than by what's behind it: cast iron drains under the slab, water damage behind old tub surrounds, moving a shower in a concrete slab, and condo rules.

A bathroom is the smallest room most people remodel and the one with the most going on per square foot. Water supply, drains, a vent, a shower pan that has to hold water for decades, electrical next to water, ventilation, and in South Florida, a concrete slab under all of it. That's why a bathroom that looks simple on a Pinterest board can turn into four permits and six inspections.

We remodel bathrooms across Miami-Dade, Broward and Palm Beach, from single-family houses built in the 1950s to condo units in towers. This guide covers what we explain to every owner before the first tile comes off: the permits, the inspections, the code requirements that shape the design, the published cost data, and the South Florida conditions that decide the real price.

What a bathroom remodel costs in Miami: the published numbers

We don't publish prices for bathrooms we haven't seen. The Cost vs. Value report, an annual survey by the Journal of Light Construction that prices standard projects in more than 150 markets, is the best published benchmark. Its 2025 figures for Miami:

Bathroom projects in Miami, Cost vs. Value 2025
ProjectAverage job costValue added at resaleCost recouped
Bath remodel, midrange$25,565$19,19075.1%
Bath remodel, universal design$40,234$25,00362.1%
Bath remodel, upscale$79,971$33,68142.1%
Bathroom addition, midrange$59,213$30,55751.6%
Bathroom addition, upscale$108,530$41,30838.1%
Source: Cost vs. Value 2025, Miami, © Zonda Media, published by the Journal of Light Construction. Averages for a defined standard project, not quotes. Miami's figures run close to the national averages: $26,138 for a midrange bath remodel and $81,612 for upscale.

Two things stand out. A midrange bathroom gets back about three quarters of its cost at resale. And the universal design bathroom, built for accessibility with a curbless shower, grab bars and wider clearances, costs more than midrange but recoups more than upscale. If you're planning to stay in the house, our guide to aging-in-place remodeling explains how to build one on a slab.

What actually drives the price of a South Florida bathroom

Fixtures and tile are the part everyone shops for. In our experience, the swings in price come from the things nobody sees until demolition:

  • Cast iron drains under the slab. Homes built before the mid 1970s often have cast iron drain lines that have cracked or scaled after decades. If the tub or shower drain is gone, the floor gets opened. Our cast iron pipe guide explains the options, from trenching to lining.
  • Water damage behind the old surround. Slow leaks behind tub walls and around toilets rot framing and subfloor and can leave mold. When it's found, it gets fixed before anything is closed up. If the damage is beyond a small area, mold assessment and remediation are licensed trades in Florida, as explained in our mold after a flood guide.
  • Moving the shower, toilet or vanity. On a concrete slab, a new drain location means cutting and trenching the slab and reconnecting to the main line. Keeping fixtures where they are is the single biggest way to control cost.
  • Curbless showers. Building a shower without a curb on a slab means recessing the floor or building up the rest of the bathroom so water still slopes to the drain. It's very doable, but it has to be planned from the start.
  • Old tile and adhesives. Older floor tile, mastic and some joint compounds can contain asbestos. Our demolition division's page on kitchen and bathroom demolition explains when testing makes sense before tear-out.
  • Condo rules. Building approval, work hours, elevator reservations, insurance certificates and sound control under new floors all add time and cost in a condo. See our condo renovation guide.

Which permits a bathroom remodel needs

Each trade gets its own permit, pulled by a contractor licensed in that trade. Using Pompano Beach's kitchen and bath renovation checklist and Miami-Dade's plumbing guidance as examples, here's how the work usually lines up:

Typical permits for a South Florida bathroom remodel
WorkPermit usually needed
Replacing tile and cement board, framing, wallsBuilding
New shower, replaced shower pan, moved or added fixturesPlumbing
New circuits, receptacles, lighting changesElectrical
New or relocated bath exhaust fanMechanical in many cities, shown on the plans
Changing glass shower doors, vanity top, mirror, paintOften none on its own; ask your city
Miami-Dade's plumbing guidance says a building permit is required when tile and cement board are replaced, and that replacing a shower pan takes a stand-alone plumbing permit. Pompano Beach requires separate structural, plumbing and electrical permit applications for a bath renovation, with the exhaust fan shown on the plans and a mechanical application. Requirements vary by city.

A July 2026 state law exempted some small non-structural residential work under $7,500 from building permits, but plumbing and electrical work still need their permits, so most real bathroom remodels aren't covered. Our post on whether you need a permit walks through the exemption, and our permit cost comparison shows what the fees run in each city.

The inspections, in order

Every permitted bathroom gets inspected before the work is covered. Miami-Dade's plumbing inspection checklist shows what the inspector looks at, and Pompano Beach's checklist lists the inspections for each trade:

  1. Plumbing underground or ground rough if the slab was opened: drain sizing, slope and depth, with a water test.
  2. Plumbing rough: drain and vent rough-in, fixture spacing, backing for wall-hung fixtures and access to cleanouts.
  3. Shower pan: the pan liner has to be an approved material (ASTM D4068 or D4551), the shower at least 900 square inches, the floor sloped to the drain, and the pan filled with water for the test. Tub and shower valves are checked for anti-scald protection.
  4. Electrical rough and framing, then the drywall or backer board screw inspection.
  5. Finals for each trade: fixtures installed as approved, clearances met, cleanouts accessible, and the electrical, mechanical and building work signed off.

Code requirements that shape a bathroom design

The Florida Building Code is based on the International Residential, Plumbing and Electrical codes, and these are the requirements that most often decide a bathroom layout:

  • Shower size. At least 900 square inches of floor area with a minimum interior dimension of 30 inches. A 30 by 30 shower is the smallest that passes.
  • Anti-scald valves. Shower and tub-shower valves must be pressure-balancing, thermostatic or a combination, limiting hot water to protect against scalding.
  • Ventilation. A bathroom needs either an openable window of the required size or an exhaust fan ducted to the outside, not into the attic.
  • GFCI protection. Bathroom receptacles must be GFCI protected, and bathroom receptacles are fed by a 20-amp circuit.
  • Safety glass. Glass in shower and tub enclosures, and glass within the wet area near them, must be safety glazing, which is why shower doors are tempered.
  • Clearances. A toilet needs at least 15 inches from its centerline to a wall or fixture on each side and 21 inches of clear space in front. These numbers decide whether a layout fits.

Your plans examiner and inspector apply the exact sections for your permit. A designer or contractor who knows these limits up front saves you from a layout that looks great on paper and fails at the shower pan inspection.

Tub-to-shower conversions

Replacing a tub with a walk-in shower is one of the most common bathroom projects in South Florida, especially for owners planning to age in place. It's a plumbing job, not just a tile job: the drain usually moves from the end of the tub to the shower drain location, which on a slab means opening the floor, and the new shower needs its own pan, liner and inspection. One thing to weigh: if it's the only tub in the house, some buyers with young children will notice. In homes with a second bathroom, it rarely matters.

Condo bathrooms: the extra layer

In a condo, the building's rules come first. Expect association approval of the scope before the permit, a certificate of insurance from every contractor, set work hours, and protection of common areas. Many buildings and cities require sound control under new hard floors above the ground level; Pompano Beach, for example, asks for lab-tested assemblies rated at least 50 for both airborne and impact sound (STC and IIC). Cutting the slab for a drain is usually not an option in a condo, especially in post-tensioned buildings, so curbless showers there are built up rather than recessed.

How we price a bathroom

Because so much of a bathroom's cost hides behind the walls, we price bathroom remodels cost plus whenever we can, with open books: you see the actual invoices, every contractor and supplier discount is passed on to you, and permit fees go through at cost. If you'd rather bring your own tile setter or plumber, we'll work them into the schedule, as long as they're licensed and insured for permitted work. Our guide to how contractors price jobs explains the trade-offs.

Before you start: a short checklist

  1. Decide what stays where. Keeping the toilet, shower and vanity drains in place is the biggest cost decision you'll make.
  2. Pick fixtures and tile early. Valves, drains and niches have to be known before rough-in, and special-order items set the schedule.
  3. Check the house's age. Plumbing from before the mid 1970s and old tile mean budgeting for what demolition might find.
  4. Get the paperwork right. Permits in the right contractors' names, a written scope, and lien releases with each payment. Our contract checklist covers the rest.
  5. Plan for the inspections. Ask your contractor for the inspection sequence and don't let tile start before the shower pan passes.

If you're remodeling more than the bathroom, our kitchen remodeling guide covers the other room people redo most. And if you're planning a bathroom now, tell us about it.

Quick questions

How much does a bathroom remodel cost in Miami?
According to the 2025 Cost vs. Value report, a midrange bathroom remodel in Miami averaged $25,565, a universal design bathroom $40,234 and an upscale remodel $79,971. Actual prices depend on whether fixtures move, the condition of the drains and framing, and finishes.
Do I need a permit to remodel a bathroom in Florida?
Usually yes. A new shower, replaced shower pan or moved fixtures need a plumbing permit, new circuits need an electrical permit, and replacing tile and cement board or framing typically needs a building permit. Some cities also require a mechanical permit for a new exhaust fan. Swapping a vanity top, mirror or shower door on its own often doesn't need one, but check with your city.
What is a shower pan inspection?
It's the plumbing inspection done before tile covers the shower floor. The inspector checks that the pan liner is an approved material, the shower is at least 900 square inches, the floor slopes to the drain, and the pan holds water during a fill test. Tub and shower valves are also checked for anti-scald protection.
What is the minimum shower size in Florida?
The Florida Building Code requires a shower to have at least 900 square inches of floor area with a minimum interior dimension of 30 inches, so 30 by 30 inches is the smallest that passes.
Is a bathroom remodel worth it for resale in South Florida?
A midrange bathroom remodel in Miami recouped 75.1 percent of its cost at resale in the 2025 Cost vs. Value report. Upscale bathrooms recouped 42.1 percent, so the more you spend, the more of it is for your own enjoyment rather than resale.
Do I need a permit for a tub-to-shower conversion?
Yes, in most cases. Converting a tub to a shower usually moves the drain and requires a new shower pan, which needs a plumbing permit and a shower pan inspection. Miami-Dade notes that a stand-alone plumbing permit is required to replace a shower pan.

Sources

This article is general information, not legal advice. Building departments in Miami-Dade, Broward and Palm Beach counties set their own procedures, so confirm the requirements for your property with your local building department.

Scott Rosenberg

Florida Certified General Contractor, CGC1541479

Scott qualifies Rosemont Ventures Group LLC and has worked in general contracting since 1998. He writes Building Blocks to answer the questions South Florida owners ask before they build. Verify the license.