Building or Remodeling in Davie, FL: Permits, Rural Lifestyle Rules, Drainage Districts and Big-Lot Projects

By Scott Rosenberg, licensed GC8 min read

The short answer

In Davie, permit applications go through the town's Online Application Submittal system and plans are uploaded through ProjectDox; since January 12, 2026, paper and emailed applications aren't accepted. Simple permits can be handled as walk-through permits on Wednesday mornings. Additions need a signed and sealed survey and plans, a drainage cross section showing floor and flood elevations, a soil report, Broward County environmental approval, and reviews by engineering, landscaping and zoning, plus Health Department approval on septic or well properties. On land zoned AG, A-1 or R-1, the town's Rural Lifestyle rules apply: one home per acre, 4-foot fences in front yards and along roads, homes facing the street, garage doors set back from the front door and pitched roofs of at least 4:12. Most of Davie drains through the Central Broward Water Control District, and work in drainage easements or projects that add fill need the drainage authority's approval, with runoff from a 25-year storm kept on the property. A Notice of Commencement is required for jobs over $5,000.

Davie is the part of Broward where you can still see horses from the road. Big lots, trails, barns and long driveways sit a few minutes from Nova Southeastern and the turnpike. That's why so much of the work here is additions, garages, guest houses and new custom homes, and why the town reviews them a little differently than its neighbors do.

This guide covers what is specific to building and remodeling in Davie, based on the town's own permit checklists and code.

How permits work in Davie

  • Online only. Since January 12, 2026, applications go through the town's Online Application Submittal system, and plans and documents are uploaded through ProjectDox once you get its email invitation. Paper applications and permits emailed to staff aren't accepted.
  • Walk-through permits on Wednesdays. Simple permits can be handled as walk-throughs on Wednesday mornings from 8 to 10:30, in person or online.
  • Bigger jobs pay up front. For permits with a job value of $100,000 or more, a drop-off fee is paid before the plans are routed for review.
  • Updated county form. Broward County's updated standard building permit application has been required since March 9, 2026.
  • Notice of Commencement. For jobs over $5,000, a Notice of Commencement has to be recorded. The town recommends submitting the signed contract as proof of the job's value.

Davie is in Broward County, so it's in the High-Velocity Hurricane Zone: roofs, windows, doors, shutters and even sheds need HVHZ approvals. Our NOA lookup guide shows how to check one.

What an addition needs in Davie

The town's residential addition checklist is a good picture of how Davie reviews bigger projects. Beyond the application and the contractor's paperwork, it asks for:

  • A signed and sealed survey, or a survey affidavit if the survey is more than two years old and nothing has changed, plus a site plan showing the work, dimensions and setbacks.
  • A drainage cross section showing the finished floor elevation, the base flood elevation and the elevation of the lowest equipment.
  • Complete signed and sealed plans, including electrical, mechanical and plumbing, energy forms, A/C load calculations for each zone, and a special inspector form.
  • A soil report or soil improvement plan from a geotechnical engineer.
  • Product approvals and shop drawings, which can come later for an added fee.
  • A tree affidavit when the work doesn't conflict with existing trees, and a hold harmless agreement for work in a utility easement.
  • Outside approvals: Broward County's environmental review, with the town permit applied for within 30 days of that approval; the Health Department on properties with a septic tank or well; and the drainage district if the work is in a drainage easement.

Additions are reviewed by building, engineering, landscaping and planning and zoning. Our guide to permit drawings explains who prepares each part, and our post on second-story additions covers going up instead of out.

The Rural Lifestyle rules

Much of Davie is zoned AG, A-1 or R-1, and on that land the town's Rural Lifestyle regulations shape what a house can look like. Their stated purpose is to keep the open spaces, trails and mix of home styles that make Davie feel different, and they override other parts of the code that would allow something they don't.

Key Rural Lifestyle standards for homes on AG, A-1 and R-1 land
TopicThe rule
DensityOne home per gross acre
Fences4 feet maximum in front yards and along roads and scenic corridors; 6 feet elsewhere. Split rail, black or green vinyl-coated chain link and decorative pickets are allowed; shadow box and board-on-board only inside the building envelope
Walls3 feet maximum, and not allowed in scenic buffers
OrientationHomes face the street, with the front door facing the street
GaragesStreet-facing garage doors sit at least 15 feet behind the front door
RoofsPitched roofs at least 4:12, except gambrel roofs; flat roofs only over rear porches and utility rooms, up to 25 percent of the roof
FacadesAt least 15 percent of each facade has to be windows or other glazing
VarietyNo identical elevations, paint colors or roof colors next to each other or across the street within a six-lot block
LightingShielded fixtures, with exterior lighting kept to 1.5 footcandles
From the Town of Davie's Rural Lifestyle Regulations. Setbacks and lot sizes come from the zoning district itself, and a Scenic Corridor Overlay adds buffers along roads like Flamingo Road and Davie Road. Confirm the rules for your parcel with the town's planning and zoning division.

For a remodel, the rules that come up most are fences, garage placement and roof pitch. A front-loading garage addition, a flat-roofed room on the front of the house or a 6-foot fence along the road is exactly what gets flagged in review, so it's worth designing around them from the start.

Drainage districts, fill and big lots

Davie has more drainage authorities than most cities: the South Florida Water Management District, the Central Broward Water Control District, the South Broward Drainage District, the Tindall Hammock district and Broward County. The town says most projects fall where Central Broward has jurisdiction. Projects that can affect drainage need an approval stamp or letter from the right one before the town permit moves forward.

  • Fill and grading. Adding fill to raise a pad or a yard means showing where the fill goes, how much, and the final elevations, and keeping runoff from a 25-year storm on your own property.
  • Acre lots outside a planned subdivision need a recent signed and sealed boundary and elevation survey, dated within a year, and a site plan with cross sections at the property lines.
  • Lots in subdivisions with a drainage plan add a copy of that plan and show how the change fits it.
  • Fences and other work in drainage easements need the district's approval too. PVC and metal fences also need signed and sealed plans.

Plenty of Davie homes also run on a septic tank and a well. Adding bedrooms or bathrooms can mean the septic system has to be checked or enlarged, and that goes through the Florida Department of Health in Broward before the town issues the permit. If the property is in a flood zone, read our post on the 50 percent rule before you size an addition.

Inspections

  • Next business day. Requests made before 4:30 p.m. are scheduled for the next business day; requests made Friday, over the weekend or on a holiday go to the next business day.
  • Cancel early. Since November 1, 2025, inspections canceled after 8:30 a.m. may carry an added fee.
  • Roof inspections need a ladder. An OSHA-approved ladder has to be set up and secured to the roof on inspection day.
  • Permits expire. Under the Florida Building Code, a permit expires if work doesn't start within 180 days, or if 90 days pass without an approved inspection.

When the old house comes down

On a big Davie lot, the land is often worth more than the house on it, and a teardown and new custom home can make more sense than a deep renovation. Our demolition division handles demolition in Davie under the same license, so the teardown, the drainage and fill work and the new home can be one contract. Our guide to what it costs to build a house in South Florida and how long it takes cover the rest of the plan.

Working in more than one city? Our South Florida building permits guide compares how permits work in each city and county, with links to every local guide.

The bottom line

In Davie, apply online through the town's portal, use Wednesday walk-throughs for simple jobs, and expect additions to need drainage, soil, county environmental and sometimes Health Department sign-offs. On AG, A-1 and R-1 land, design around the Rural Lifestyle rules for fences, garages and roofs, and on bigger lots, bring the drainage district in before you add fill. We handle room additions and garages, new custom homes, whole-home renovations and kitchens and baths in Davie and across Broward. Tell us about your project.

Quick questions

How do I apply for a building permit in Davie, FL?
Through the town's Online Application Submittal system, with plans uploaded through ProjectDox. Since January 12, 2026, Davie no longer accepts paper applications or permits emailed to staff. Simple permits can be handled as walk-throughs on Wednesdays from 8 to 10:30 a.m.
What are Davie's Rural Lifestyle rules?
They apply to land zoned AG, A-1 or R-1 and limit density to one home per acre, cap front-yard and roadside fences at 4 feet, require homes to face the street with garage doors at least 15 feet behind the front door, and require pitched roofs of at least 4:12, among other standards meant to keep Davie's rural character.
How tall can a fence be in Davie?
On AG, A-1 and R-1 land, fences in front yards and along roads or scenic corridors can be up to 4 feet, and other fences up to 6 feet. Walls are limited to 3 feet. PVC and metal fences need signed and sealed plans, and fences in drainage easements need the drainage district's approval.
Which drainage district covers my Davie property?
Most of Davie is in the Central Broward Water Control District, but parts fall under the South Broward Drainage District, the Tindall Hammock district, Broward County or the South Florida Water Management District. Work in drainage easements, and projects that add fill, need the right authority's approval.
Do I need a Notice of Commencement in Davie?
Yes, for jobs over $5,000. It's recorded with the county and posted on the job, and the town recommends submitting the signed contract as proof of the job's value.
Does my Davie addition need Health Department approval?
If the property is on a septic tank or a well, yes. Adding bedrooms or bathrooms can require the septic system to be evaluated or enlarged, and the Health Department's approval comes before the town issues the permit.

Sources

This article is general information, not legal advice. Building departments in Miami-Dade, Broward and Palm Beach counties set their own procedures, so confirm the requirements for your property with your local building department.

Scott Rosenberg

Florida Certified General Contractor, CGC1541479

Scott qualifies Rosemont Ventures Group LLC and has worked in general contracting since 1998. He writes Building Blocks to answer the questions South Florida owners ask before they build. Verify the license.

Free estimate

Tell us what you want to build

Send a few details and a licensed contractor will call you back, usually within one business day. We'll talk through scope, permits and a realistic budget range. No pressure and no obligation.

Request a callback