Skip to main content
RosemontVentures Group

Permits

Building or Remodeling in Weston, FL: Quick Permits, the $7,500 Exemption, Fence and Lake Easement Rules, and HOAs

By Scott Rosenberg, licensed GCUpdated 10 min read

The short answer

In Weston, building permits come from Weston Permitting Services at 17250 Royal Palm Boulevard and are filed through the city's ePermits portal, with free virtual training on Tuesdays and Thursdays. Common jobs like windows, doors, re-roofs, A/C changeouts, fences, pools, generators and solar qualify as quick permits, with a 3 to 5 business day review once the submittal is complete. Most permits need the Weston permit packet, the Broward County uniform application and the signed contract, and a Notice of Commencement for jobs over $5,000 ($15,000 for A/C changeouts) has to be recorded and posted before the first inspection. Since July 1, 2026, single-family work under $7,500 can skip the permit with a written exemption request, but not electrical, plumbing, mechanical, gas or structural work, which in Weston includes windows, doors, roofing, fences and pool barriers, and not on property in a flood hazard area. Fences are capped at 6 feet, can't go in front of the house or into a lake maintenance easement, and need their own posts. Nearly every exterior change also goes through your HOA.

Weston is about as planned as a South Florida city gets. Wide boulevards, lakes behind half the houses, neighborhoods built mostly in the 1990s and 2000s, and an HOA for almost everyone. The upside is that you always know what the neighbors' houses will look like. The other side is that your project has two sets of rules to clear: the city's and your association's.

This guide covers what is specific to building and remodeling in Weston, based on the city's own permit checklists, forms and code.

How permits work in Weston

  • One office for everything. Weston Permitting Services handles building, engineering, planning and zoning, and landscape permits from the Administrative Service Center at 17250 Royal Palm Boulevard, open 7:30 a.m. to 4:30 p.m. on weekdays.
  • Apply through ePermits. You register an account on the city's ePermits portal and upload applications and documents there. If you've never used it, the city runs free virtual training on Tuesdays at 11 a.m. and Thursdays at 2 p.m.; email the building office by 3 p.m. the day before to get the link.
  • The base package. Most permits need the Weston Building Code Services permit packet, the Broward County Uniform Building Permit Application and a contract or agreement showing the total job cost.
  • Notice of Commencement. Required for projects over $5,000, or over $15,000 for A/C changeouts, and it has to be recorded and posted on the job site before the first inspection.
  • Contractors register with the city. There's no fee, but the contractor's file has to include a state license, a business tax receipt, workers' comp and liability insurance listing the City of Weston as certificate holder.
  • Revisions cost extra. Plan changes submitted after the permit is issued go in as a revision, at $111.57 per trade for residential work under the city's current checklist.

One thing that surprises people: Weston contracts out its building inspections. The city's annual building report for fiscal year 2025 shows 5,236 permit applications and 19,584 inspections and reinspections, every one of them performed by a private provider. For you, it works the same way as any city inspection, but it explains why the people who show up on site aren't city employees.

Quick permits: the 3 to 5 day lane

Weston has a quick permit track for common single-scope jobs, with a 3 to 5 business day review cycle once the submittal is complete. The clock doesn't start on a partial package, so the checklist matters.

What Weston's quick permit checklist asks for, by job
JobWhat to include
Windows, doors, garage doors, shuttersProduct approvals, the Broward County uniform retrofit window and door schedule, the wind load chart and a site plan with dimensions
Re-roofThe High-Velocity Hurricane Zone roof permit application, the owner's notification form for roofing and the property appraiser's assessed valuation
A/C changeoutMechanical application, anchoring details or product approvals, and a survey (with a survey affidavit if it's more than a year old)
New poolSigned and sealed plans, the lot coverage form, pool barrier and alarm specifications, and a survey
FenceSigned and sealed plans for PVC or metal fences; the city's chain link table for chain link
Shed, pergola or gazeboSigned and sealed plans, the lot coverage form, a survey and a site plan
SolarElectrical and structural plans, the special inspector form and a survey
Water heaterPlumbing application, specifications and the dwelling unit water heater replacement form
From the City of Weston Quick Permit Application Checklist (revised May 2026). Quick permits also cover driveways and walks, patio and pool decks, rooftop equipment, generators, electrical service upgrades and screen enclosures. Confirm current requirements with Weston Permitting Services before you apply.

Weston is in Broward County, so it's in the High-Velocity Hurricane Zone, and every window, door, shutter and roof product needs an approval rated for it. Our guide to Miami-Dade NOAs and Florida product approvals explains what to check on a quote. If you're replacing windows, our post on My Safe Florida Home grants and the new sales tax refund shows how to pay less for them.

The new $7,500 permit exemption, Weston's version

Since July 1, 2026, state law lets owners of single-family homes, and their contractors, skip the building permit for small jobs under $7,500. Weston's summary of the rule is worth reading closely, because it's narrower than the headlines:

  • Still needs a permit at any price: electrical, plumbing, mechanical, gas and structural work. Weston's list of structural work includes railings, pool barriers and fences, windows and doors, siding and soffits, roofing and elevated decks.
  • Still needs a permit in a flood hazard area, whatever the cost.
  • No splitting. The exemption applies only to a complete, single project under $7,500, so breaking a job into smaller pieces doesn't work.
  • You still have to ask. Submit the city's Permit Exemption Request Form with a copy of the contract or other paperwork showing what the work is and what it costs, in person or by email.
  • Temporary flood barriers have their own exemption, but only on single-family, two-family or townhouse properties outside a special flood hazard area, installed by a licensed contractor and meeting the city's zoning, drainage and setback rules.

In practice, the exemption covers things like flooring, interior paint, trim and cabinet swaps without plumbing or electrical changes. Most of what Weston homeowners actually call us for, like windows, roofs, kitchens and baths, still needs a permit. Our permit guide covers the statewide rules.

Fences, pools, sheds and the lake behind your house

Weston's zoning code is specific about yards, and the easements behind most lots are where projects run into trouble.

Key Weston rules for single-family yards
TopicThe rule
Fence height6 feet maximum, or 8 feet where the lot abuts nonresidential property
Fence locationNot in front of the house, meaning forward of the sides of the main structure; at least 3 feet from the right-of-way, with a continuous hedge at least 4 feet tall between the fence and the street
EasementsFences can't extend into lake maintenance, landscape maintenance, drainage or utility easements; the city's fence sheet lists a 25-foot setback from lake and landscape maintenance easements
NeighborsNo connecting to a neighbor's fence; each fence needs its own posts and can't encroach onto the next lot
Chain linkBlack or green vinyl-coated, with top and bottom rails
PoolsSide and rear setbacks on single-family lots can be reduced to 5 feet if no recorded easement is affected; a perimeter fence used as the pool barrier has to be at least 60 inches tall
Sheds and accessory buildings12 feet maximum height; on the rear half of an interior lot, side and rear setbacks can drop to 5 feet; they have to match the house's roof, materials, color and style
Lot coverageImpervious area on a single-family lot is capped at 60 percent, which is why pools, decks and sheds need the lot coverage form
From the City of Weston's fence zoning requirements and sections 124.33, 124.34 and 124.36 of the Weston Code. Your HOA may be stricter, and your survey and plat show which easements cross your lot.

The lake easement is the one we see catch people. A pool deck, fence or pergola that looks like it fits the backyard can land partly inside the strip the city or the district needs for lake bank maintenance. Pull your survey before you design anything back there.

Trees and landscaping

Weston protects its tree canopy through permits. Removing or relocating a tree can need a permit from the city's Tree Preservation Division, which may require relocation, replacement trees or a payment into the Weston Tree Trust Account. Street trees and trees on HOA property can't be removed without a city permit. And under Chapter 122 of the city code, tree and palm trimming, removal, relocation and root pruning have to be done by a city-registered tree service provider unless you do the work yourself. If an addition or pool needs a tree moved, call the division before the design is final.

HOAs: the second approval

Weston was built largely around homeowner associations, and the city keeps a list of them that must register every year. For almost any exterior change, from windows and roofs to paint, pavers, fences and additions, your association's architectural review comes into play. Under the 2026 state law, an HOA can't require you to get a building permit before it reviews your plans, so the two can move at the same time. Our post on HOA approval and building permits explains the law, and the practical advice is simple: submit to the HOA as soon as the design is set, not after the city approves.

Flood maps and drainage

Weston sits on former Everglades land, and its lakes are part of the drainage system. Broward County's updated FEMA flood maps took effect July 31, 2024, and for new construction and substantial improvements, the new base flood elevations apply. If your lot is in a special flood hazard area, a big remodel or addition falls under the 50 percent rule, and the $7,500 exemption doesn't apply. On the plus side, Weston has a Class 6 rating in FEMA's Community Rating System, worth a 20 percent discount on eligible NFIP flood policies, and under Risk Rating 2.0 it applies in every flood zone. Our table of flood insurance discounts by city compares Weston with every other South Florida community. Our post on flood-proofing a South Florida home covers what to do about it.

Pulling the permit yourself

Weston accepts owner-builder permits on one- and two-family homes with a notarized owner-builder affidavit. You have to supervise the work on site yourself, and you can't build or improve the house to sell or rent it; selling or leasing within a year of completion is presumed to break that rule. Hiring unlicensed help under an owner-builder permit leaves you as the responsible party, which is why our guide to hiring a general contractor is worth a read either way.

When the old house comes down

Some Weston buyers decide the 1990s floor plan isn't worth saving and start over. Our demolition division handles demolition in Weston under the same license, so the teardown and the new house can be one contract. Our guides to what it costs to build a house in South Florida and how long it takes cover the rest.

Working in more than one city? Our South Florida building permits guide compares how permits work in each city and county, with links to every local guide.

The bottom line

In Weston, file through ePermits, use the quick permit track for windows, roofs, A/C, fences and pools, and have the contract and Notice of Commencement ready. Don't count on the $7,500 exemption for anything structural. Check your survey for lake and landscape maintenance easements before designing a pool, fence or pergola, ask about trees early, and send your plans to the HOA at the same time as the city. We handle kitchen and bath remodels, whole-home renovations, additions and impact windows and doors in Weston and across Broward. Tell us about your project.

Quick questions

How do I apply for a building permit in Weston, FL?
Through the city's ePermits portal, run by Weston Permitting Services at 17250 Royal Palm Boulevard. Most permits need the Weston permit packet, the Broward County uniform application and the contract, and the city offers free virtual training on the portal on Tuesdays and Thursdays.
How long does a quick permit take in Weston?
Weston's quick permit track has a 3 to 5 business day review cycle once the submittal is complete. It covers jobs like windows, doors, re-roofs, A/C changeouts, fences, pools, generators, solar and water heaters.
Can I skip a permit for work under $7,500 in Weston?
For some single-family work, yes, with a written exemption request to the city and a copy of the contract. It doesn't cover electrical, plumbing, mechanical, gas or structural work, which in Weston includes windows, doors, roofing, fences, railings and pool barriers, and it doesn't apply on property in a flood hazard area or to a job split into pieces.
How tall can a fence be in Weston?
Up to 6 feet on residential lots, or 8 feet next to nonresidential property. Fences can't go in front of the house or into lake maintenance, landscape maintenance, drainage or utility easements, have to be at least 3 feet from the right-of-way with a 4-foot hedge, and can't connect to a neighbor's fence.
Do I need a Notice of Commencement in Weston?
Yes, for projects over $5,000, or over $15,000 for A/C changeouts. It has to be recorded and posted on the job site before the first inspection.
Do I need a permit to remove a tree in Weston?
Often, yes. Tree removal and relocation go through the city's Tree Preservation Division, which may require relocation, replacement or a payment into the Weston Tree Trust Account. Street trees and trees on HOA property can't be removed without a city permit, and the work has to be done by a city-registered tree service unless you do it yourself.

Sources

This article is general information, not legal advice. Building departments in Miami-Dade, Broward and Palm Beach counties set their own procedures, so confirm the requirements for your property with your local building department.

Scott Rosenberg

Florida Certified General Contractor, CGC1541479

Scott qualifies Rosemont Ventures Group LLC and has worked in general contracting since 1998. He writes Building Blocks to answer the questions South Florida owners ask before they build. Verify the license.

Free estimate

Tell us what you want to build

Send a few details and a licensed contractor will call you back, usually within one business day. We'll talk through scope, permits and a realistic budget range. No pressure and no obligation.

Request a callback