The short answer

In Pembroke Pines, permits are applied for online through the city's Development Hub, with plans uploaded in separate files by trade, and email applications are no longer accepted. Almost every residential permit needs a Homeowners Association Affidavit of Awareness, even if the house is not in an association, plus a landscaping compliance affidavit and a survey. Properties inside the South Broward Drainage District need a release from the district before the city issues the permit, and any non-mechanical job over $5,000 needs a recorded Notice of Commencement before the first inspection. Additions also need a survey showing the flood zone and finished floor elevation, an elevation certificate and engineering, landscaping and zoning review.

Pembroke Pines is one of the biggest cities in Broward, stretching from older neighborhoods in the east to newer communities near the Everglades in the west. A lot of its homes are now old enough for new roofs, kitchens and additions, and most of them sit in a homeowners' association. The city's permit process reflects both of those things, with a few requirements that catch people who have only built in other cities.

This guide covers what is specific to building and remodeling in Pembroke Pines, based on the city's own permit checklists.

Permits run through the Development Hub

  • Online portal. The city moved to new permitting software, EnerGov, on April 4, 2022, reached through its Development Hub. You have to be registered as a contact in the Hub to apply online.
  • No email applications. Since April 25, 2022, the city no longer accepts permit applications by email. Apply through the Hub or in person at the Building Department.
  • Upload by trade. Plans go up in separate files by trade: all structural sheets in one file, all mechanical in another, and so on for electrical and plumbing. Incomplete packets are not processed.
  • Keep the permit on site. When the permit is issued, you download the permit card and approved plans from the Hub, and that copy has to be on site for inspections.

Pembroke Pines is in Broward County, so it is in the High-Velocity Hurricane Zone, and windows, doors and roofing need HVHZ approvals. Our post on what the High-Velocity Hurricane Zone means for your project explains what that changes.

Paperwork almost every permit needs

The city's checklists repeat a handful of forms across most residential permits. Have them ready and the application moves faster:

  • The HOA Affidavit of Awareness. The checklists say it must be submitted even if you do not belong to an association. It confirms you know about any association rules; it is not the association's approval itself.
  • The landscaping compliance affidavit. Required on improvements to residential lots.
  • A property survey showing the setbacks and where the work goes.
  • The Broward County Uniform Permit Application, plus electrical, mechanical or plumbing applications when those trades are involved.
  • A Utility Easement Hold Harmless Agreement when work is in or near an easement, which is common with fences and driveways.
  • A Notice of Commencement for any non-mechanical job valued over $5,000. It has to be recorded, submitted and posted before the first inspection is scheduled.

The South Broward Drainage District

Parts of Pembroke Pines are inside the South Broward Drainage District, which manages canals and stormwater in the southwest of the county. If your property is in the district, the city's checklists require a permit or release from the district for work such as additions, fences and driveways. Its review deals with drainage and the district's canals and easements, so build it into your schedule, especially on a lot that backs up to a canal or lake.

What each common project needs

Pembroke Pines checklist items beyond the application and plans
ProjectItems the city's checklist calls out
Room additionSurvey showing flood zone, existing finished floor elevation and setbacks; elevation certificate; signed and sealed drawings; soil report if applicable; special inspector form for reinforced masonry or pilings; asbestos documentation; Broward County environmental approval; sub-permits for the roof and every opening; drainage district release if applicable. Reviewed by building, electrical, mechanical, plumbing, engineering, landscaping and zoning.
ReroofHVHZ roofing package; asbestos release form; rooftop mounted equipment affidavit; a roof-to-wall connection affidavit when the home is insured or valued over $300,000, completed by a licensed contractor, architect, engineer or certified inspector.
FenceSurvey and site plan; PVC and metal fences need plans signed and sealed by a Florida architect or engineer, while wood and chain link can follow the building code's prescribed installation method; drainage district release if applicable.
DrivewaySurvey; engineering and zoning review using the city's driveway and paver design details; sidewalk apron consent form; a form for concrete in the swale if applicable; drainage district release if applicable.
From the City of Pembroke Pines permit checklists. Checklists are updated from time to time, so download the current one for your project before you apply.

The roof-to-wall connection affidavit ties into a state rule: on some reroofs in hurricane areas, the roof-to-wall connections have to be checked and, if needed, improved. If you are planning an addition in a flood zone, read our post on the 50 percent rule first; and if you are thinking about turning a garage into living space, our garage conversion guide covers parking and flood issues.

Your HOA is a separate approval

Most Pembroke Pines neighborhoods have an association with architectural rules for additions, roofs, windows, fences and paint. The city's affidavit does not replace the association's approval; you still need it. Florida law changed in 2026 so an association can't require a building permit before it reviews your plans, which lets the two run at the same time. Our post on HOA approval and building permits explains the rules.

How long it takes

Florida law gives building departments deadlines once an application is complete, from 5 business days for small jobs on an existing home to 30 business days for a new home under 7,500 square feet. In Pembroke Pines, the HOA, a drainage district release and multiple plan reviews on an addition add time before and alongside that clock. Our post on how long building permits take covers the deadlines.

Working in more than one city? Our South Florida building permits guide compares how permits work in each city and county, with links to every local guide.

The bottom line

In Pembroke Pines, apply through the Development Hub with plans uploaded by trade, include the HOA affidavit and the landscaping affidavit on nearly every permit, check whether the property is in the South Broward Drainage District, and record the Notice of Commencement before the first inspection. Get the association's approval moving at the same time. We handle room additions, kitchen and bathroom remodels, whole-home renovations and impact windows and doors in Pembroke Pines and across Broward. Tell us about your project.

Quick questions

How do I apply for a building permit in Pembroke Pines?
Online through the city's Development Hub, which runs on the EnerGov permitting system, or in person at the Building Department. You need to be registered as a contact in the Hub, plans are uploaded in separate files by trade, and the city stopped accepting applications by email in April 2022.
Do I need an HOA affidavit if I'm not in an HOA in Pembroke Pines?
Yes. The city's permit checklists say the Homeowners Association Affidavit of Awareness must be submitted even if you do not belong to an association. If you are in one, you still need the association's own approval.
What is the South Broward Drainage District release?
If a Pembroke Pines property is inside the South Broward Drainage District, the city's checklists require a permit or release from the district for work such as additions, fences and driveways before the city issues its permit.
When do I need a Notice of Commencement in Pembroke Pines?
For non-mechanical jobs valued over $5,000. It has to be recorded, submitted to the city and posted on the job before the first inspection is scheduled.
Can I use any dumpster company in Pembroke Pines?
No. The city's checklists note that City Ordinance 2013-09 requires roll-off containers to come from Waste Pro.

Sources

This article is general information, not legal advice. Building departments in Miami-Dade, Broward and Palm Beach counties set their own procedures, so confirm the requirements for your property with your local building department.

Scott Rosenberg

Florida Certified General Contractor, CGC1541479

Scott qualifies Rosemont Ventures Group LLC and has worked in general contracting since 1998. He writes Building Blocks to answer the questions South Florida owners ask before they build. Verify the license.